Announcements - NC State University (2024)

If it’s on your mind, it’s on Togetherall

Date Posted: 4.17.24

Connect with Togetherall’s online peer support community to assist you in navigating the challenges and emotions associated with the end of the semester

More info

General - DELTA Outage

Date Posted: 3.25.24

More info

load balancer service engine config

Date Posted: 3.13.24

On Thursday, March 14th, between 7:00 am and 10:00 am, DELTA staff will be updating the load balancer service engine configuration. We do not expect any interruption to services during this time, but the possibility cannot be ruled out.

More info

Faculty: Starting Saturday 3/16 You May Request Future 2024 WolfWare Spaces

Date Posted: 3.11.24

Faculty can request WolfWare Spaces for future 2024 Courses in the future tab. Review our Requesting a WolfWare Space article for specific directions.

More info

Updating DELTA storage infrastructure

Date Posted: 3.7.24

On Wednesday, March 13th, between 8:00am and 12:00 noon, DELTA staff will be updating the software on our Vast storage clusters. Due to the redundant nature of the systems we do not expect any interruption of service during this work.

More info

DELTA Infrastructure Maintenance

Date Posted: 3.7.24

Between Tuesday, March 12th at 1pm through Wednesday, March 13th at 6pm, DELTA staff will work on Linux server reboots and primary database server restarts for system and security updates . This work will cause brief (<10 minute) outages to WolfWare WordPress, some DELTA websites, and DELTA Testing Center applications.

More info

DELTA Infrastructure Maintenance

Date Posted: 3.7.24

Between Tuesday, March 12th at 1pm through Wednesday, March 13th at 6pm, DELTA staff will work on Linux server reboots and primary database server restarts for system and security updates . This work will cause brief (<10 minute) outages to WolfWare WordPress, some DELTA websites, and DELTA Testing Center applications.

More info

DELTA Infrasturctue Maintenance

Date Posted: 3.7.24

Update 3-14-2024: his work is scheduled for Friday, March 15th, between 8:00am and 1:00 pm.Update 3-11-2024: This work will be delayed until later in the week.
On Monday, March 11th, between 8:00am and 1:00pm DELTA staff will be performing maintenance on the hardware that runs the DELTA managed services including WolfWare, WolfWare WordPress, and Moodle. There will be a brief (15 minute) outage of all DELTA services during this time. While we do not expect a longer interruption there is always a possibility with this type of work.

More info

Faculty: Off-Campus Telephone Service For LearnTech is down.

Date Posted: 3.5.24

Due to a university-wide degradation beginning on March 5, DELTA's LearnTech Help Desk is currently unable to receive calls or voicemails from from off-campus callers. All support requests for Moodle and related course technologies should be sent to learntech@ncsu.edu or through the Help Desk Website (https://delta.ncsu.edu/get-help/) until this issue is resolved.

More info

Stressed about midterms? Share it on Togetherall

Date Posted: 3.4.24

Stressed about midterms? Share it on Togetherall go.ncsu.edu/togetherall

More info

Update to quiz backgrounds

Date Posted: 2.7.24

Update 2024:-03-07: This work will be performed on Tuesday, March 12th, between 1:00 and 4:00 pmUpdate 2024-02-09: This maintenance has been delayedOn Saturday, February 10th, between 7:00 am and 10:00 am, DELTA staff will be providing updates to all Moodle environments, Courses, Projects and Outreach. During this work each Moodle server will experience a brief (<10 minute) interruption.

More info

WolfWare Website sluggishness

Date Posted: 1.22.24

Update 11:35am: WolfWare and other DELTA tools seem to be working since 10:45 am. Please contact LearnTech (learntech@ncsu.edu) if you continue to see any issues.

Around 8:30 am on Monday, Jan 22nd, the WolfWare website and several other DELTA online tools including the testing center's proctoring tool began experiencing sluggishness and issues with access. DELTA staff is troubleshooting the issue and attempting to resolve the issues.

More info

fix for Brickyard users in Moodle

Date Posted: 1.11.24

More info

Moodle 2324 Degradation

Date Posted: 1.9.24

DELTA staff have noticed occasional high system load yesterday (1/8) and this morning (1/9) on the Moodle Courses 2324 instance. We have taken steps to try and prevent any full outages from occurring but it is possible users may have noticed intermittent sluggishness and/or connection timeouts both during the day yesterday and this morning. We will continue to monitor closely and apologize for any inconvenience this may have caused.

More info

WolfWare Outage

Date Posted: 1.8.24

Brickyard users accounts have been having issues in Moodle related to multiple Shibboleth plugins. At 4:00pm today (January 11th) DELTA staff will be implementing a fix for the issue. No interruption to service is expected.

More info

WolfWare move to new production servers

Date Posted: 12.19.23

On Tuesday, January 2nd, between 9:00 am and 6:00 pm, DELTA staff will be moving the WolfWare website and the apps.delta site to new production servers. While we do not expect any extended interruptions during this time, there will be a short (< 10 minute) outage during this time.

More info

WolfWare website Brickyard Login Support

Date Posted: 12.19.23

On Wednesday, January 3rd, between 12:00 noon and 6:00 pm DELTA staff will be adding support to allow Brickyard users to log into the WolfWare website. While we do not expect any major interruptions, the WolfWare website may not be fully functional during this time.

More info

Moodle plugin updates

Date Posted: 12.14.23

On Monday, December 18th, between 1:00 pm and 5:00 pm, DELTA staff will be performing updates to various plugins on Moodle Courses2324, Projects, and Outreach services. This work will cause brief (<10 minute) interruptions to each of these services.

More info

WolfWare WordPress maintenance

Date Posted: 12.14.23

On Monday, December 18th, between 9:00 am and 5:00 pm, DELTA staff will be performing maintenance on the WolfWare WordPress service. This work will cause an extended outage of WolfWare WordPress during this time.

More info

Linux server reboots and updates

Date Posted: 12.14.23

Monday, December 18th and Tuesday December 19th, DELTA staff will be rebooting various Linux servers to apply system and security updates. While many of the servers can be rebooted without causing any interruptions to services, there are some servers which cannot be rebooted without causing an interruption. Therefore during this time there may be brief (<10 minute) outages for WolfWare, WolfWare WordPress, DELTA websites, and DELTA Testing Center applications. We do not expect any longer interruptions to occur.

More info

Recharge your inner batteries during De-Stress Fest

Date Posted: 11.27.23

Celebrate your work this semester and finish strong by prioritizing your mental health and well-being in the ways you need it most. Find support today: go.ncsu.edu/destress_fest

More info

Moodle Updates

Date Posted: 11.15.23

On Saturday, November 18th, between 7:00 am and 10:00 am, DELTA staff will be updating various plugins in Moodle. There will be a brief (<10 minute) interruption of each Moodle service (Courses, Projects, and Outreach) during this time. We do not anticipate any extended interruptions.

More info

WolfWare WordPress Update

Date Posted: 11.1.23

On Friday, November 3rd, between 1:00 and 4:00 PM, DELTA staff will be performing an update to the WolfWare WordPress service. We do not expect any interruption of service during this maintenance.

More info

Moodle update and plugin updates

Date Posted: 11.1.23

On Saturday, November 4th, between 6:30 and 8:30 AM, DELTA staff will be updating the Moodle service. This work will affect all current Moodle service stacks including Courses, Projects, and Outreach. There will be a brief (<10 minute) interruption to each of the Moodle services. We do not expect the work to take the entire window but reserve the larger window in case of unexpected issues.

More info

New Peer Support Platform at Your Fingertips

Date Posted: 10.18.23

Join Togetherall, an anonymous peer support community availableonline 24/7, 365 days a year: go.ncsu.edu/togetherall

More info

Announcements - NC State University (2024)
Top Articles
Latest Posts
Article information

Author: Prof. Nancy Dach

Last Updated:

Views: 6599

Rating: 4.7 / 5 (77 voted)

Reviews: 92% of readers found this page helpful

Author information

Name: Prof. Nancy Dach

Birthday: 1993-08-23

Address: 569 Waelchi Ports, South Blainebury, LA 11589

Phone: +9958996486049

Job: Sales Manager

Hobby: Web surfing, Scuba diving, Mountaineering, Writing, Sailing, Dance, Blacksmithing

Introduction: My name is Prof. Nancy Dach, I am a lively, joyous, courageous, lovely, tender, charming, open person who loves writing and wants to share my knowledge and understanding with you.